By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Latest World News UpdateLatest World News Update
  • Home
  • Business
  • National
  • Entertainment
  • Sports
  • Health
  • Science
  • Tech
  • World
  • Marathi
  • Hindi
  • Gujarati
  • videos
  • Press Release
    • Press Release
    • Press Release Distribution Packages
  • Live Streaming
  • Legal Talk
Reading: Ashwini Vaishnaw reviews progress at Mumbai bullet train station – World News Network
Share
Notification Show More
Font ResizerAa
Font ResizerAa
Latest World News UpdateLatest World News Update
  • Home
    • Home 1
  • Categories
  • Legal Talk
  • Bookmarks
  • More Foxiz
    • Sitemap
Have an existing account? Sign In
Follow US
  • Advertise
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Latest World News Update > Blog > National > Ashwini Vaishnaw reviews progress at Mumbai bullet train station – World News Network
National

Ashwini Vaishnaw reviews progress at Mumbai bullet train station – World News Network

worldnewsnetwork
Last updated: May 3, 2025 12:00 am
By worldnewsnetwork 4 Min Read
Share
SHARE

Mumbai (Maharashtra) [India], May 3 (ANI): Union Railways Minister Ashwini Vaishnaw on Friday inspected the construction progress of the Mumbai-Ahmedabad bullet train station located at the Bandra Kurla Complex (BKC) in Mumbai. He stated that work on the site is moving ahead at a rapid pace following the handover of land by the Maharashtra government.
“The work on Mumbai’s Bandra Kurla Complex station is progressing very rapidly. If you look at the work, the construction of B3, which is our lowest basement level, is moving ahead quickly,” Vaishnaw said during the inspection.
He further noted that structural reinforcement has already been completed. “The work to strengthen the site’s walls has been completed. Now, the construction of the station walls has begun,” he added.
Providing details of the station design, Vaishnaw said, “This station will be a multi-storey building, and it will have three basement levels – B3, B2, and B1. Vehicles will be parked in B3, operational work will take place in B2, and passengers will enter the station from B1 and the ground level.”
He also highlighted progress on the tunnel works associated with the high-speed rail project. “Alongside this, the tunneling work is also advancing at a fast pace, and as soon as the land from the Maharashtra government was received, the speed of the work increased significantly,” he said.
Meanwhile, approximately 76 per cent of the excavation work has been completed on the Mumbai bullet train station located at BKC, which is the only underground station on the Mumbai-Ahmedabad High-Speed Rail Corridor.
According to a release, 14.2 lakh cubic metres of the excavation work has been completed. 18.7 lakh cubic metres of earthwork must be excavated from this site.
Three batching plants of 120 cum/hr capacity are functional at site. Batching plants are provided with an ice plant and a chiller plant that help control concrete temperature.
The site is provided with a modern concrete lab, with facilities like a Water Permeability Test, a Rapid Chloride Penetration Test, etc. All concrete tests are conducted at the site, and samples are intermittently sent to a reputed lab.
Base Slab is being cast with M-60 grade of temperature-controlled concrete. Each base slab casting required 3,000 to 4,000 cubic metres of concrete at controlled temperatures, which is being produced by in-situ batching plants and chiller plants.
The platform is planned at a depth of about 26 metres below ground level. There will be three floors including platform, concourse and service floor. Excavation for the said work is being done till a depth of 32 metres (approx. 100 ft) from the ground level, which is equivalent to a 10-storied building.
The station will have six platforms, each approximately 415 m long (sufficient to accommodate a 16-coach bullet train). It will be connected to the metro and the road.
Two entry/exit points are planned, one to facilitate access to the nearby Metro station of Metro Line 2B, and the other towards the MTNL building.
The station has been planned in a way that ample space is available for passenger movement and amenities at the concourse and platform level.
A dedicated skylight provision has been made for natural lighting. (ANI)

Contents
WORLD MEDIA NETWORKPRESS RELEASE DISTRIBUTIONPress releases distribution in 166 countriesPress releases in all languagesPress releases in Indian LanguagesIndia PackagesEurope PackagesAsia PackagesMiddle East & Africa PackagesSouth America PackagesUSA & Canada PackagesOceania PackagesCis Countries PackagesWorld Packages

Disclaimer: This story is auto-generated from a syndicated feed of ANI; only the image & headline may have been reworked by News Services Division of World News Network Inc Ltd and Palghar News and Pune News and World News

sponsored by

WORLD MEDIA NETWORK


PRESS RELEASE DISTRIBUTION

Press releases distribution in 166 countries

EUROPE UK, INDIA, MIDDLE EAST, AFRICA, FRANCE, NETHERLANDS, BELGIUM, ITALY, SPAIN, GERMANY, AUSTRIA, SWITZERLAND, SOUTHEAST ASIA, JAPAN, SOUTH KOREA, GREATER CHINA, VIETNAM, THAILAND, INDONESIA, MALAYSIA, SOUTH AMERICA, RUSSIA, CIS COUNTRIES, AUSTRALIA, NEW ZEALAND AND MORE

Press releases in all languages

ENGLISH, GERMAN, DUTCH, FRENCH, PORTUGUESE, ARABIC, JAPANESE, and KOREAN CHINESE, VIETNAMESE, INDONESIAN, THAI, MALAY, RUSSIAN. ITALIAN, SPANISH AND AFRICAN LANGUAGES

Press releases in Indian Languages

HINDI, MARATHI, GUJARATI, TAMIL, TELUGU, BENGALI, KANNADA, ORIYA, PUNJABI, URDU, MALAYALAM
For more details and packages

Email - support@worldmedianetwork.uk
Website - worldmedianetwork.uk

India Packages

Read More

Europe Packages

Read More

Asia Packages

Read More

Middle East & Africa Packages

Read More

South America Packages

Read More

USA & Canada Packages

Read More

Oceania Packages

Read More

Cis Countries Packages

Read More

World Packages

Read More
sponsored by

You Might Also Like

BJP’s strength lies in trusting grassroots workers, says Tripura CM Manik Saha at Pristha Pramukh Sammelan – World News Network

Udhayanidhi Stalin says DMK Youth Wing key to 2026 victory – World News Network

IndiGo warns of possible flight cancellations as dense fog engulfs Delhi – World News Network

“Youngest national working president yet”: Union Minister Giriraj Singh on Nitin Nabin – World News Network

MK Stalin urges DMK youth to lead ‘Dravidian Model 2.0’, takes aim at BJP ahead of 2026 polls – World News Network

Share This Article
Facebook Twitter Email Print
Previous Article “Agricultural production of MP is best in country,” says MP CM Mohan Yadav – World News Network
Next Article “Uttarakhand CM will be present at time of opening of doors of Badrinath Temple”: Chamoli DM – World News Network
Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Stay Connected

FacebookLike
TwitterFollow
YoutubeSubscribe
TelegramFollow
- Advertisement -
Ad image

Latest News

60% Indians expect higher household spending; GenAI reshapes how consumers buy: BCG Report – World News Network
Business
Power demand remained flat in November as mild winter keeps consumption in check: Report – World News Network
Business
Ideas, Culture, Futures, Oakridge Bachupally Creates a Defining Moment in Education – World News Network
Business
Giridhar Pai Associates Celebrates Six Years of Innovative Pest Management Solutions – World News Network
Business
Copyright © 2024 World News Network. All Rights Reserved.
Welcome Back!

Sign in to your account

Lost your password?