By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Latest World News UpdateLatest World News Update
  • Home
  • Business
  • National
  • Entertainment
  • Sports
  • Health
  • Science
  • Tech
  • World
  • Marathi
  • Hindi
  • Gujarati
  • videos
  • Press Release
    • Press Release
    • Press Release Distribution Packages
  • Live Streaming
  • Legal Talk
Reading: MP CM Mohan Yadav orders action over faulty Aishbagh railway overbridge design, 8 engineers held responsible – World News Network
Share
Notification Show More
Font ResizerAa
Font ResizerAa
Latest World News UpdateLatest World News Update
  • Home
    • Home 1
  • Categories
  • Legal Talk
  • Bookmarks
  • More Foxiz
    • Sitemap
Have an existing account? Sign In
Follow US
  • Advertise
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Latest World News Update > Blog > National > MP CM Mohan Yadav orders action over faulty Aishbagh railway overbridge design, 8 engineers held responsible – World News Network
National

MP CM Mohan Yadav orders action over faulty Aishbagh railway overbridge design, 8 engineers held responsible – World News Network

worldnewsnetwork
Last updated: June 29, 2025 12:00 am
By worldnewsnetwork 4 Min Read
Share
SHARE

Bhopal (Madhya Pradesh) [India], June 29 (ANI): Madhya Pradesh Chief Minister Mohan Yadav ordered strict action after taking cognisance of serious negligence in the construction of the Aishbagh Railway Overbridge (ROB) in Bhopal. Following his directions, eight engineers of the Public Works Department (PWD) were held accountable based on the findings of an investigation.
In a post on X, CM Yadav said, “I took cognisance of the serious negligence in the construction of the Aishbagh ROB and ordered an investigation. Based on the investigation report, action has been taken against 8 engineers of the PWD.”
https://x.com/DrMohanYadav51/status/1938997097300402599
The action included the immediate suspension of seven engineers, including two Chief Engineers (CEs). Additionally, a departmental inquiry was initiated against a retired Superintending Engineer (SE).
The government also blacklisted the construction agency and the design consultant involved in the project. They were found responsible for submitting a faulty design of the ROB, which led to safety concerns.
To address the structural issues, the Chief Minister announced the formation of a special committee to implement necessary improvements in the ROB. He clarified that the bridge would not be opened to the public until all rectifications were completed.
“The ROB will be inaugurated only after the improvements are made,” CM Yadav added in the post.
Earlier on Thursday, Yadav said that he had instructed officials and the state minister to rectify the objection raised against a Railway Over Bridge (ROB) with a design featuring around 90-degree sharp turns in Bhopal and take action against those responsible for the mistake.
“Recently, it was brought to my notice about the issue of a bridge (ROB) being built with an almost 90-degree sharp turn. I said that it was being constructed from 2022 and is yet to be inaugurated. The bridge is under construction. In such a situation, I have asked officials and the minister to consider the objection raised, rectify the curve to avoid any accidents and also take action against those who make the mistake,” CM Yadav told reporters.
He further said, “We hope to be more vigilant in the matter of construction and pay more attention to such constructions and arrangements in the state.”
The Aishbagh Railway Overbridge, nearly a decade in the making, drew public attention and criticism due to its design, which features a sharp 90-degree turn. The 648-metre-long and 8-metre-wide bridge was constructed at a cost of Rs 18 crore.
Earlier, State PWD (Public Works Department) Minister Rakesh Singh had stated that the project was five years old and that its design had already been prepared. He added that the bridge was inspected by the National Highways Authority of India (NHAI), and further action would be taken based on the inspection report. (ANI)

Contents
WORLD MEDIA NETWORKPRESS RELEASE DISTRIBUTIONPress releases distribution in 166 countriesPress releases in all languagesPress releases in Indian LanguagesIndia PackagesEurope PackagesAsia PackagesMiddle East & Africa PackagesSouth America PackagesUSA & Canada PackagesOceania PackagesCis Countries PackagesWorld Packages

Disclaimer: This story is auto-generated from a syndicated feed of ANI; only the image & headline may have been reworked by News Services Division of World News Network Inc Ltd and Palghar News and Pune News and World News

sponsored by

WORLD MEDIA NETWORK


PRESS RELEASE DISTRIBUTION

Press releases distribution in 166 countries

EUROPE UK, INDIA, MIDDLE EAST, AFRICA, FRANCE, NETHERLANDS, BELGIUM, ITALY, SPAIN, GERMANY, AUSTRIA, SWITZERLAND, SOUTHEAST ASIA, JAPAN, SOUTH KOREA, GREATER CHINA, VIETNAM, THAILAND, INDONESIA, MALAYSIA, SOUTH AMERICA, RUSSIA, CIS COUNTRIES, AUSTRALIA, NEW ZEALAND AND MORE

Press releases in all languages

ENGLISH, GERMAN, DUTCH, FRENCH, PORTUGUESE, ARABIC, JAPANESE, and KOREAN CHINESE, VIETNAMESE, INDONESIAN, THAI, MALAY, RUSSIAN. ITALIAN, SPANISH AND AFRICAN LANGUAGES

Press releases in Indian Languages

HINDI, MARATHI, GUJARATI, TAMIL, TELUGU, BENGALI, KANNADA, ORIYA, PUNJABI, URDU, MALAYALAM
For more details and packages

Email - support@worldmedianetwork.uk
Website - worldmedianetwork.uk

India Packages

Read More

Europe Packages

Read More

Asia Packages

Read More

Middle East & Africa Packages

Read More

South America Packages

Read More

USA & Canada Packages

Read More

Oceania Packages

Read More

Cis Countries Packages

Read More

World Packages

Read More
sponsored by

You Might Also Like

Light to moderate rainfall likely in many parts of Himachal Pradesh in next few hours: IMD – World News Network

“Double-faced”: Maharashtra Deputy CM Eknath Shinde slams Sena-UBT amid language row – World News Network

“Lot of political changes expected in Karnataka after September”: Minister KN Rajanna – World News Network

Uttarakhand: Char Dham Yatra suspended for 24 hours amid heavy rain alert – World News Network

“Ecologically devastating”: Congress’ Jairam Ramesh on Centr’s plans to redraw Sariska Tiger Reserve boundaries for mining – World News Network

Share This Article
Facebook Twitter Email Print
Previous Article Gautam Adani, family join Lord Jagannath Rath Yatra in Puri – World News Network
Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Stay Connected

FacebookLike
TwitterFollow
YoutubeSubscribe
TelegramFollow
- Advertisement -
Ad image

Latest News

Mark Hamill reveals dark alternate backstory for Luke Skywalker in ‘Star Wars: The Last Jedi’ – World News Network
Entertainment
‘Demon Slayer Kimetsu no Yaiba Infinity Castle’ movie trailer out, to hit theatres on this date – World News Network
Entertainment
‘Grosse Pointe Garden Society’ cast bids farewell after series cancelled for second season – World News Network
Entertainment
‘Cobra Kai’ creators reveal they reached out to Hilary Swank for final season cameo – World News Network
Entertainment
Copyright © 2024 World News Network. All Rights Reserved.
Welcome Back!

Sign in to your account

Lost your password?